HYDROELECTRIC POWER

At SISENER we have collaborated continuously, since our creation, in updating the capacity data, search and location of sites and their subsequent feasibility studies.

The projects carried out range from purely administrative (to the own processing of Town Councils, Provinces and Communities, we add the same of the Hydrographic Confederations), passing through specific parts such as automation and SCADA systems, regulation and control and reaching the realization of Engineering of detail, direction and supervision of work and commissioning.

A highly demanded job in this field is the modernization of facilities, modification or execution of maneuvers or the updating of schemes that, in all cases, we analyze, propose, and resolve with great agility and safety.

Given the business areas in which we carry out our activity, we offer complete solutions for hydroelectric power plants, which include connection / evacuation infrastructures: generation substations, sectioning centers and connection lines, as well as the electrical studies necessary for their processing and commissioning, both in a stationary and transitory regime.